INSTALLATION OF ANTI-PID04-3 SYSTEM IN A SOLAR FARM IN MELAMBES - 80KW

INSTALLATION OF ANTI-PID04-3 SYSTEM IN A SOLAR FARM IN MELAMBES - 80KW

After measurements conducted with a thermal camera and open cirquit measurements I-V, a decreased performance was observed due to Potential-Induced Degradation (PID) on a 20kW PV installation. 

Therefore, ANTI-PID04-3 devices were installed in order to restore the system to its initial efficiency over a period of about 3 to 6 months. 

Farm Characteristics:

  • PV panels Yingli Solar 260W
  • Inverter SMA 15kW
  • Fixed mounting