INSTALLATION OF PV-BOOSTER ON A ROOFTOP - 10kW

INSTALLATION OF PV-BOOSTER ON A ROOFTOP - 10kW

After measurements conducted with a thermal camera and open cirquit measurements I-V, a decreased performance was observed due to Potential-Induced Degradation (PID) on a 10kW PV installation. 

Therefore, a PV BOOSTER  device was installed in order to restore the system to its initial efficiency over a period of about 3 to 6 months.