All projects
- All
- Self-production in Industrial buildings
- Solar Pumping
- Self-production in Domestic buildings
- Wind Farms
- Photovoltaic Stations
- Off-Grid
PV self-production system (net metering) with a power of 580 kW in a rural cooperative
PV system of self-production (net metering) with a power of 73.2 kW in a hotel unit
Domestic Photovoltaic Σystem of self-production (Net Metering) with a power of 13.08 kW
Installation of a device for dealing with the PID effect ( pv booster ) in a 10 kW PV installation
Installation of a device for dealing with the PID effect ( pv booster ) in a 10 kW PV installation
Installation of anti-pid04-3 in an 80 kW PV park in Melampes
Anti-pid04-3 installation in park with 20 kW tracker drive system
Autonomous Pumping System in Kastellii-Moira, Heraklion [9.5 kW]